top of page
This project involved the resurfacing of SH 93 in R1 from US 6 to 58th Avenue in Golden. Alongside resurfacing, it encompassed minor widening, guardrail work, and the installation of intersection signalization at 58th Ave. Throughout the process, RockSol provided construction oversight, materials testing and inspection and essential administrative support.
PROJECT
CDOT R1 SH 93 Resurfacing from
US 6 to SH 58 Ave (Construction Package)

bottom of page