top of page

This project is located within the limits of the Town of Superior and divided into three segments. The first segment is on the south side of US 36 beginning at the existing bike overpass passing beneath the 8th Street bridge and connecting to the east side of 88th Street. The second segment is on the east side of Rock Creek Parkway between 88th Street and Honey Creek Lane. The third segment is located at Autrey Park. RockSol provided construction management, inspection and materials for all three phases.

PROJECT

Town of Superior US 36 Bikeway Extension

bottom of page