top of page
This CMGC project involved reconstructing this flood-damaged roadway to address stream repair, roadway resiliency, rockfall mitigation, drainage, widened uphill shoulder for bikes, and reestablishing travel lane geometry including 14 miles of final paving. This project also helped improve the 14-mile section to today's safety standards. RockSol provided critical owner’s side CM preconstruction support which included plan and specification review, assistance with Risk Register development, and assistance with OPCC and CAP negotiations. RockSol provided construction management guidance for the pre-construction phase of this CMGC project.
PROJECT
CDOT R4 SH 7 Lower Permanent Repairs (Pre-Construction Package)